# Job work: how to track material at your vendors and catch missing kilos

> A simple guide for Indian manufacturers: what to write down when material goes out for job work, how to catch missing kilos, and a 5-minute weekly routine to know what is still with your vendors.

Published 2026-11-16, updated 2026-11-16 by Navaloom (https://www.navaloom.com). Canonical: https://www.navaloom.com/blog/job-work-material-tracking

## Key takeaways

- Write the weight, not just the count, on every challan going out and coming back.
- Agree the normal loss with each job worker before work starts.
- Give every challan an expected return date, so late shows up before it becomes lost.
- Check your "still with vendors" list every week. Five minutes is enough.

## What is job work?

Job work is when you send your own material, like yarn, fabric or parts, to another business (the job worker) to process it, and they send it back. You still own the material while it is with them, so you need to know at all times how much is there.

- **Paper to send material:** A challan, linked to your order
- **Write on it:** Count and weight, agreed loss, return date
- **Check on return:** Your gate weight against theirs
- **Normal loss:** Agreed per process, before work starts
- **Review:** A "still with vendors" list, every week

You send yarn to the dyer. Fabric to the weaver. Cut pieces to the stitching unit. Weeks later, the goods come back, but some kilos are missing, and nobody is sure where they went. Ask how much of your material is with vendors today, and it takes a day of phone calls to answer.

## Why does material go missing in job work?

In your own factory, you can walk to the rack and count. When material is at a job worker's unit, you only know what your papers say. Problems usually start in four places:

- **The challan is not linked to an order.** The yarn went to the dyer, but for which order? Which design?

- **Weights are written but never compared.** 500 kg went out. 472 kg came back. Is 28 kg normal, or too much?

- **Goods come back in parts.** Three trips, three slips, typed in by three different people.

- **Nobody owns the full list.** Ask "how much of our material is with vendors today?" Most businesses need a day to answer.

**Diagram: One job, from start to finish**

- Challan out 500 kg
Yarn sent to the dyer for P.O. 1832

- At the job worker Dyeing
Agreed normal loss: 4%, so 20 kg

- Back in 3 trips 472 kg
180 + 160 + 132 kg, weighed at your gate

- Gap to check 8 kg
28 kg less, but only 20 kg is allowed

_Write the weight at every step. Compare it with the agreed loss. The gap is what you ask the job worker about._

## What should every job work challan have?

Every time material leaves for a job worker, make sure the challan has:

| What to write | Why |

| Challan number and date | So every return can point back to it. |

| Job worker's name | So you can see everything that is with one vendor. |

| Your order or job card number | So every kilo is linked to the work it is for. |

| Item, count and weight | Weight is what shows you a gap. |

| Agreed normal loss | So you judge a gap against a number, not a feeling. |

| Expected return date | So you see "late" before it becomes "lost". |

## What should you check when goods come back?

- **Link it to the challan.** Every return slip must carry the number of the challan it belongs to.

- **Weigh it at your gate.** Write your weight next to the job worker's weight. If they differ, ask now, not next month.

- **Record waste separately.** If the job worker keeps the waste or scrap, write that down too.

- **Close the challan only when it is complete.** Either everything is back, or the shortfall is accepted with a reason.

**Diagram: Where did the 500 kg go?**

472 kg back208
Came back (94.4%)Allowed loss, 4%Not explained: ask the job worker

_A small gap on one challan is easy to ignore. Across a year and ten job workers, it adds up to a lot of money._

## How long is too long at a job worker?

Material sitting at a vendor is your money, stuck where you can't see it. The longer it stays, the harder it gets: it gets mixed with other parties' goods, slips get lost, and the person who sent it may have moved on. Set simple steps from the expected return date:

**Diagram: The clock starts on the challan date**

- Day 1 Material leaves, with an expected return date

- Every week Check what is still with vendors

- 1 week late Call or message the job worker

- 1 month late The owner calls. No new work until it is sorted

_Late is normal now and then. Late without anyone asking is how material disappears._

## What does a good weekly routine look like?

**Diagram: Your Monday "still with vendors" list**

Material with job workersMonday 9:30

| Job worker | Sent | Still with them | Status |

| Dyer#1832 · 12 Sep | 500 kg | 0 kg | 8 kg short |

| Weaver#1840 · 3 Oct | 1,200 m | 450 m | On time |

| Stitching unit#1791 · 20 Sep | 900 pcs | 120 pcs | 3 weeks late |

_Oldest first, gaps in red. Five minutes on a Monday saves days of searching later._

- **Monday:** look at the list above, oldest challans first.

- **Call or message** every job worker who is late, or whose loss is above the agreed number.

- **Close** challans that are fully back. Write a reason for any loss you accept.

- **Once a month:** compare loss by job worker. If one is always worse than the others, talk to them.

## Where does software help?

A register or a spreadsheet can do all of this, if one careful person owns it. It breaks when entries come from many people: the gate guard, the store, the accounts team, and the job workers, often as WhatsApp photos of handwritten slips.

That is the work Navaloom's agents do. The gate guard sends a photo of the challan on WhatsApp. The agent reads it, matches it to the order and the challan that went out, and compares the weights. It asks the owner only when something is wrong, for example: _"P.O. 1832 came back 8 kg short after the agreed loss. Accept, or ask the dyer?"_ Your "still with vendors" list is ready every morning, without anyone typing it up.

## Questions people ask

### How much loss is normal in job work?

It depends on the process. Dyeing, washing and cutting all lose some material. Agree a percentage with each job worker before work starts, write it on the challan, and check every return against it.

### What should I do when the weight that comes back is short?

Compare it with the agreed loss first. If the gap is bigger, ask the job worker the same day, with the challan number and both weights. Gaps are much easier to sort out within a week than after a month.

### Can the job worker keep the waste or scrap?

Yes, if you both agree. But write it down, because waste and scrap are part of the material balance. Otherwise the numbers never add up.

### How do I know which job worker loses the most material?

Once a month, add up the loss per job worker across all their challans. If one is always worse than the others for the same process, that is the conversation to have.

### Do I need software to track job work?

Not always. A register or spreadsheet works if one careful person owns it. Software helps when entries come from many people: the gate, the store, the accounts team and the job workers.